January 2014 Completion

Air Tech completed a medium sized project for Swissport - Dublin HUB Airport.

Air Tech installed the following;

  • 1 x 15 ft. Truck Dock
  • 2 x 10 ft. Work Stations
  • 5 x 10 ft. NEL Powered Roller Beds
  • 1 x 20 ft. NEL Powered Roller Beds with Loadcells and Weighing Station
  • 2 x 4.5m Castor Decks
  • 1 x 10 ft. WEL Powered Roller Beds
  • 1 x 10 ft. WEL Dolly Dock
  • 1 x 1000 mm NEL Powered Roller Bed
  • 2 x 1400 mm NEL Powered Roller Bed

The project ran on time and schedule with both the depot and area manager praising Air Tech’s Engineering prowess. 